[X]
Report Link
Video has been deleted
Wrong video
Audio out of sync
There was an error converting the video
Other (explain below)

Details:

Tokyo Metro operates 9 subway lines with a network stretching a total of 195km. Connecting to a number of main stations in Tokyo on both private and JR lines, Tokyo Metro carries 7.4 million passengers and makes 5,700 trips per day. To handle the demands of such a high-density line, operating schedules are broken down into 5-second increments. We go behind the scenes to find out how the drivers are trained to operate such a precise schedule. Also, see how Japan's very first subway line is being transformed using the latest technology.

Running
  • Currently 0.0/5
(0 votes)
Title: Tokyo Metro: A Subway Network On Time & On Track
Air Date: April 26, 2019
Runtime: 30 min
Genres: Travel

Free Links

Currently there are no links. Request links

Search on other sites

Japan Railway Journal ( S2019 E6 ) Comments

Post a Comment

Please login to make a comment

Comments